1.5KE100A A0G
137V Clamp 11.4A Ipp Tvs Diode Through Hole DO-201
Images are for reference only.
SkyChip No.
6R3JX-1-5KE100A-A0GTB
OPN#
1.5KE100A A0G
Manufacturer
Description
TVS DIODE 85.5VWM 137VC DO201
Datasheet
Lifecycle Status
Active
Factory Lead Time
-
· Free Samples Available
· Alternate Part Support
· PCB Assembly (PCBA)
· IC Programming Services
Parameters
Dist. Version
Technical Documentation
| ECCN | EAR99 |
| HTSUS |
|
| MSL | 1 (Unlimited @ ≤ 30°C/85% RH) |
| REACH Compliance | REACH SVHC Free |
| RoHS Status | RoHS 3 (2015/863) Compliant |
Possible Alternative Parts
Part Number:1.5KE100A-AT/B
Manufacturer:YAGEO
Availability:0
Pricing$0.16
SkyChip No.:I6J4S-1-5KE100A-AT-BTB
Part Number:1.5KE100A-G
Manufacturer:Comchip Technology
Availability:0
Pricing$0.35
SkyChip No.:B757H-1-5KE100A-GTB
Substitution Analysis:Substitution is acceptable, with a note on the slight reduction in peak pulse current capability. The 1.5KE100A-G is identical to the original part (1.5KE100A A0G) in all key protection ... View More
Part Number:1.5KE100A-HF
Manufacturer:Comchip Technology
Availability:0
Pricing$0.37
SkyChip No.:PWAI3-1-5KE100A-HFTB
Substitution Analysis:Substitution is acceptable, and the conclusion is identical to that for the 1.5KE100A-G. Based on the provided parameters, the 1.5KE100A-HF matches the 1.5KE100A-G in all critical electrical ... View More
| Part Number | Manufacturer | Availability | Pricing | SkyChip No. |
|---|---|---|---|---|
| 1.5KE100A-AT/B | YAGEO | 0 | $0.16 | I6J4S-1-5KE100A-AT-BTB |
| 1.5KE100A-G | Comchip Technology | 0 | $0.35 | B757H-1-5KE100A-GTB |
Substitution is acceptable, with a note on the slight reduction in peak pulse current capability. The 1.5KE100A-G is identical to the original part (1.5KE100A A0G) in all key protection ... View More | ||||
| 1.5KE100A-HF | Comchip Technology | 0 | $0.37 | PWAI3-1-5KE100A-HFTB |
Substitution is acceptable, and the conclusion is identical to that for the 1.5KE100A-G. Based on the provided parameters, the 1.5KE100A-HF matches the 1.5KE100A-G in all critical electrical ... View More | ||||
| 1.5KE100A/B | YAGEO | 0 | $0.62 | IWWYI-1-5KE100A-BCT |
Standard Supply
New Arrivals at SkyChip
MOQ
1(Multiples: 1)
Ships From
Shenzhen (Primary) or Hong Kong
Lead Time
To Be Determined
Packaging
Tape & Box
Supply Chain Inventory
354 In Stock
Stock Status
Confirmed
Supply Source
Independently Sourced
Lead Time to SkyChip
6 Business Days
* These inventory figures are provided by our partners and are subject to change with a delay.
Delivery & Payment








Datasheet